EPG has been efficiently accredited by ISO9002 Quality Administration Method, ISO9001 Good quality Management Method, API certificate, ISO/TS16949:2002 and ISO10012 measurement management program. we are self-confident to provide our clients versatile and diversified services. Services & Quality controlWe offer detailed drawings and offer each time needed. Canned EPTTrage Filling EPTT (AK)
1 Overview
This EPTT is the use of pressure filling basic principle of automatic filling valve, the EPTT shipped by the capper to sustain synchronous operation. You can modify the heigEPTT of the filling cylinEPTTto adapt to diverse specifications jar top.
two, Principal characteristics
The EPTT adopts bottle care shipping, so that the entire line conveyor comparatively secure.
Filling theory is to achieve isobaric filling, filling valve with large precision mechanical valve, filling velocity, higher precision amount, implementation has tank filling, no tank is not filling (see underneath). Making use of pre-filling valve opening go over system Gato bottom signifies a mix of construction, to ensure the stability of the EPTT when filling the tank out from the maXiHu (West EPT) Dis.mum extent filling the cylinEPTTsupporting the use of lifting EPT box to satisfy the diverse heigEPTT of the jar filling cylinEPTTliquid amount float change to make sure clean inlet.
Capper introduction of EPTTiwan wheel cover and head EPT to make certain sealing quality. This EPTT has a tank getting a decrease protect, no significantly less than the tank lid control system to make sure the regular procedure of the EPTT, lowering the charge of reduction protect
EPTnical Parameters
Product |
EPTnical Parameters |
Number of stations |
Filling twelve-60,EPT 1-15 |
Manufacturing Capability |
2000-24000 Cans/hour |
Compressed air |
.6Mpa |
Stress Air Use |
.08M3/min |
Filling Temperature |
le4 ordmC |
Cans Diameter |
53~90mm |
Cans Top |
70~220mm |
Filling precision |
plusmn5mm |
Filling strategy |
Isobaric filling |
main motor EPTT |
three.7KW |
EPTT |
380V |
EPTT Dimension |
3200 times2400 times1900mm |
EPTT Bodyweight |
4500kg |
EPT Warranty
1 calendar year guarantee and EPTtime complex assist Set up in Place
If Engineers put in in place
one) Installment USD100/day. Man or woman as allowance
two) Coaching payment is cost-free for client staff inside the installation time period
three) The tickets from EPTT to the buyer manufacturing unit and return compensated by the customer
4) The local housing , foods, and transfer EPT at client manufacturing facility paid by the buyer
Shipping amp EPTT
Oslash Delivery Time: forty daEPTTafter get your deposit.
Oslash Coming Doc:
one) EPTT EPTT Assure
2) Full established install amp keep instruction Book in EPT language
three) Total Doc for client to distinct its custom
Oslash EPTT prerequisite:
1) The EPTT EPTT box is in accordance to the immunity stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd in EPTT, it satisfies for EPTT-distance
transportation, damp evidence, rustproof, land way and seaway
FAQ
Q: Are you investing company or company ?
A: We are manufacturing facility.
Q: How EPTT is your shipping and delivery time?
A: EPTTly it is twenty – 30 daEPTT,if full line it is forty five-60 times.
Q: What is your conditions of payment ?
A: Payment lt=1000USD, 100% in EPT. Payment gt=1000USD, 30% T/T in EPT ,stability before shippment.
Any far more inquiries, make sure you truly feel totally free to speak to us!